Meningie Jetty, Vessel Mooring Facility

February 9, 2021
Filed under: Coastal Engineering,Marine Structures — Tags: , — Magryn @ 2:14 pm

​Magryn have been engaged by Coorong Council to review the design and installation of the piling and framing associated with the new vessel mooring facility located at the outer end of the main Meningie Jetty.

This facility is a fixed jetty (not floating pontoons) constructed of aluminium framing with fibreglass decking.

The facility is now complete.