Bamera Jetty Inspection

November 3, 2020
Filed under: Coastal Engineering — Tags: , — Peter Cornish @ 3:26 pm

Two of our engineers have recently undertaken an inspection (above and below water) of the Bamera jetty in Lake Bonney, for the Berri Barmera Council.

This is always challenging work, as River Murray water is very muddy, and the below water inspection needs to be done “by feel”.

Bamera Jetty closeup